Aim of the Project
The aim of the project is a mixture of the reasons for undertaking the
assignment as well as the opportunities that will evolve from it. The aims and
objectives need to be analysed in the initial stages of the works to deliver a successful
project. This planning section will develop the schematic design, ideas and
collaborations to develop the project brief.
Our Project
Outline
Project 'Situation Engine' is a visual expose,
informative and communication tool that will enable clients, industry and trade
professionals a perspective view in analysing stages of construction in a real
time environment using CryEngine3.
The project will produce two 3D models, recreated
from the Revit Architecture Sample model that will comply with the Australian
Standards and the National Construction Code. They will be showcased using the
CryEngine3 program in real time displaying a live construction site. The
project will emphasize different construction methods, various construction
stages, different materials, tools and equipment that would likely be used on
our assumed site in Sydney.
The overall result will allow clients to better understand and
experience the stages within the engine, and allow trades professionals to
manage construction phases, effectively reducing cost, time, and waste
management. Additionally, it can be used as training environments for new or
existing tradespeople entering the field.
Outputs
The outputs
of a project need strategic planning and design outcomes to define the tasks
and breakdown structure of the assignment. The ideas and implementation need to
be clearly defined to complete the initial stages of planning any project. These
outputs will determine project objectives, opportunities, risks and
constraints. Once the outputs of a project are determined the collaboration of
the team will establish project roles, structure, time frames and the individual
and group milestones that need to be achieved.
Our Project Outputs
The project will
engage the emerging technologies in an innovative way to inform people involved
within the built environment. The
project will produce a real time construction site in a virtual environment
placed in the CryEngine3. The initial planning of the assignment involved defining
roles and structure of the team members.
The
establishment of the assignment was to create ‘a real life project’, to be
built in the Eastern Suburbs of Sydney. The architectural planning based
assessments include the ‘assumed’ site,
local planning and development controls combined with the recreated Revit
Architecture sample models. Further research into the local authority and their
planning instruments helped determine the design of the building and if they
were to comply with the governing body. The construction of the models was
researched and analysed using the Building codes and standards, feedback from
Builders in Sydney and researching construction reports and precedents in the
industry. These stages have been
completed and the next stages of the assignment have been planned and the roles
and structure established.
The models designed
through Building Information Modelling (BIM) will be placed into CryEngine3.
The model will be separated into stages and construction details and methods
displayed. The final interactive environment will explore how building designs
can be displayed using the emerging technologies as an informative tool.