GROUND WORKS AND SUB-FLOOR
For Both models:
- First Site placed in Crysis (uncleared) - vegetation including trees, rocks, shrubs, existing slope and typography.
- Second Site placed in Crysis (cleared and excavated) - vegetation disappears excavation of the site to the level of (underside of concrete slab), Site fences erected
- Third Site in Crysis (excavation) - excavation of strip and pad footings
- Prepare Footings for Concrete fill
- Construct form-work
- Waterproof membrane (plastic sheeting)
- Reinforcement Supports (Chairs)
- Reinforcement (Bars and cages made up for strip and pad footings)
5. Place concrete into Crysis for the footings
Next...
01. Revit Sample Model:
- Preparation for Concrete slab on Ground
- Pipework for the dwelling (placed under kitchen, laundry and bathrooms)
- Vapour Barrier (Plastic sheeting)
- Reinforcement Supports (Chairs)
- Reinforcement (Bars and cages made up for strip and pad footings)
02. Timber Model
- Fix Timber Post Anchors to Pad footings
- Fix Timber Posts
- Fix bearers to Timber Post grid, as per detail
- Fix Floor Joists